Skip to content
Discuss Your
WhatsApp
STEEL MANUFACTURING IN CHINAGlobal project enquiries
Shouguang industrial development · project visualisation.
- Location
- Shouguang, Shandong, China
- Building use
- Industrial storage
- Warehouse buildings
- Buildings 1, 2 and 4
- Roof arrangement
- Double-layer metal roof with insulation
- Wall arrangement
- Rock wool composite panels and internal lining
Project Overview
The Shouguang Jinyumi development includes steel warehouse Buildings 1, 2 and 4 for industrial storage.
Roof & Wall Construction
The roofs use two metal layers with insulation between them. Rock wool composite panels and internal lining form the wall construction. The gallery shows the steel frames and the completed external enclosure.
Project Gallery
Select an image to view it at full size.
PROJECT ENQUIRIES
Discuss Your
Steelwork Requirements
Preparing a warehouse enquiry? Include roof and wall specifications alongside the frame geometry and storage requirements. Complete the form here and add a drawing link if available.
Send Your Project Enquiry
Share the information you have. Add a drawing link if available.






