Skip to content
STEEL MANUFACTURING IN CHINAGlobal project enquiries
Panjin heavy industrial steel building project in Shouguang

China · Industrial Factories

Heavy Industrial Crane Building for a Forging Facility

A 43,602 m² heavy steel factory with lattice columns and overhead cranes rated at 75, 50, 32 and 20 tonnes.

Location
Shouguang, Shandong, China
Building use
Forging production
Structure
Heavy steel frame with lattice columns
Eave height
18.95 m
Crane ratings
75 / 50 / 32 / 20 t
Building area
43,602 m²

Project Overview

The Shandong Panjin Forging Machinery factory is located in Shouguang. The single-storey heavy steel building uses lattice columns, socket foundations and an eave height of 18.95 metres.

Crane-Equipped Manufacturing Space

Heavy-duty overhead cranes rated at 75, 50, 32 and 20 tonnes serve the forging operation. The supporting steelwork and crane interfaces are key features of this industrial building.

PROJECT ENQUIRIES

Discuss Your
Steelwork Requirements

Tell us your project location, steelwork scope and delivery requirements. Complete the form here and add a drawing link if available.

Send Your Project Enquiry

Share the information you have. Add a drawing link if available.

Tiancheng Project Enquiry

Share a file link if you have drawings. We use your details to respond to this enquiry.

WhatsApp