Robotic welding of structural steel at the Tiancheng manufacturing workshop

MANUFACTURING CAPABILITIES

From Project Drawings
to Fabricated Steelwork.

Explore the components we fabricate, how drawings move into production, and the finishing and documentation your steelwork package can include.

Discuss a fabrication requirement ↗

01 / FABRICATION SCOPE

Components Made
to Your Drawings.

We accept customer drawings. Member dimensions, materials and fabrication requirements are assessed for the actual package.

Explore component photographs & details ↗
Fabricated H-section steel members in the Tiancheng workshop
Fabricated H-section members · Tiancheng workshop
ComponentDetails to establish before fabrication

H-section Beams & Columns

Section geometry, plate requirements, stiffeners and connection details. Two light and heavy H-section production lines support this work.

Box Columns

Section dimensions, internal plates, connection interfaces and welding access.

Steel Trusses

Member schedules, node details and the proposed division into fabrication and transport assemblies.

Crane Beams

Approved member geometry, stiffeners, connection holes and interfaces with the crane system.

Structural Bracing

Member lengths, end connections, hole positions and identification requirements.

Purlins & Secondary Steelwork

Profiles, lengths, hole layouts, connections and the specified finish.

02 / DRAWINGS & DETAILING

Resolve the Details
Before Production.

Tekla Structures and CAD support our detailing and fabrication coordination.

INPUTS

Start with Your Available Information

  • Structural and fabrication drawings
  • Member schedules or available steel quantities
  • Material and fabrication specifications
  • Connection and equipment interfaces
COORDINATION

Define Who Approves What

  • Detailing scope and required deliverables
  • Design and connection responsibilities
  • Drawing review and approval route
  • Revisions affecting fabrication
PRODUCTION RELEASE

Give the Workshop Clear Instructions

  • Confirmed drawing revisions
  • Component geometry and identification
  • Agreed materials and finishes
  • Inspection points for the package

Have an incomplete drawing package? Identify its current stage and the detailing support you need when you enquire.

03 / PRODUCTION PROCESS

How Your Steelwork
Moves Through Production.

The manufacturing sequence follows the agreed drawings, inspection requirements and order priorities.

Multiple robotic welding workstations and structural steel members in the Tiancheng workshop
ROBOTIC WELDING WORKSTATIONS

Repeatable Operations.
Coordinated Steelwork.

Robotic welding stations work on structural members within the workshop production sequence.

Cutting equipment processing a structural steel member in the Tiancheng workshop

Member Cutting

Prepare member geometry from the fabrication information.

Large steel members and assembly equipment at the Tiancheng workshop

Assembly & Member Handling

Coordinate plates, members and connections before release to the next operation.

THE PRODUCTION SEQUENCE

Equipment, people and inspection points work to the agreed drawings.

  1. 01

    Material Preparation

    Establish grades, plate and section requirements, quantities and material identification before processing.

  2. 02

    Cutting & Hole Preparation

    Prepare plates and members to the fabrication drawings, including the specified geometry and hole layouts.

  3. 03

    Assembly & Welding

    Bring members, stiffeners and connections together against the approved fabrication details and welding requirements.

  4. 04

    In-process Inspection

    Check the relevant dimensions and welds at the stages agreed for the work, before affected components move to finishing.

  5. 05

    Finishing

    Apply the agreed surface preparation and treatment system, with project-specific checks defined in advance.

  6. 06

    Identification & Release

    Coordinate component marks, inspection records and packing information before the steelwork is released for dispatch.

04 / SURFACE TREATMENT

Specify the Finish
Your Project Requires.

Treatment selection, preparation and acceptance requirements are agreed as part of the technical scope.

PREPARATION

Shot Blasting

Define the surface preparation requirement and its relationship to the specified coating system.

COATING

Painting

Provide the coating system, required layers, film thickness and inspection criteria for review.

PROTECTION

Hot-dip Galvanizing

Identify the members to be galvanized and confirm the treatment requirements against their fabrication details.

05 / FABRICATION HANDOVER

Agree the Records
with the Steelwork.

We can provide inspection and fabrication documents to the agreed project scope. Confirm the document list, inspection methods and acceptance criteria before production.

Review quality & certification ↗
  • Material certificates and documentation
  • Welding and qualification records
  • Dimensional inspection records
  • Specified non-destructive testing reports
  • Surface treatment and coating records
  • Member identification and packing lists
Factory visits and third-party inspection are welcome.Include the proposed inspection stages and visit timing with your requirements.

06 / PREPARE YOUR ENQUIRY

Send a Package
We Can Review.

Include the information available now. Flag anything still being developed so the technical review starts from a clear scope.

Drawings & revision statusMember list or steel quantityMaterial & finish requirementsInspection & document listProject location & target dates
Submit Your Fabrication Requirements ↗