Skip to content
STEEL MANUFACTURING IN CHINAGlobal project enquiries
Large steel members and assembly equipment at the Tiancheng workshop

STEELWORK PROCUREMENT · PRACTICAL CHECKLISTS

A Clearer Brief.
A Better Procurement Review.

Prepare the drawings, scope and project information your steel structure supplier needs. Use these checklists to organise your enquiry and compare offers on a consistent basis.

Get the RFQ brief template ↓

ENGLISH SUPPLIER REVIEW DOCUMENTS

Share the Details
with Your Project Team.

Download a concise company introduction, component guide or selected project references for your procurement and technical review.

Cover of the English Tiancheng Company Profile PDF

Company Profile

Engineering, manufacturing, quality and company contacts in one concise supplier introduction.

English · PDF · 3 pages · 2.5 MB

Download PDF ↓
Cover of the English Tiancheng Component Capabilities PDF

Component Capabilities

Nine types of steel columns, beams and trusses, illustrated with real component photographs.

English · PDF · 3 pages · 2.0 MB

Download PDF ↓
Cover of the English Tiancheng Selected Industrial Projects PDF

Selected Industrial Projects

Four references covering heavy manufacturing, photovoltaics, alumina processing and OSB production.

English · PDF · 4 pages · 4.6 MB

Download PDF ↓

For certificate originals and the documents relevant to your order, visit Quality & Certification ↗ or contact our team.

01 / ORGANISE THE INFORMATION

Start with the Checklist
for Your Buying Task.

Open the relevant guide. Include what is available, identify what is preliminary and list the questions that still need agreement.

01 / BUILDING ENQUIRY

Industrial Building Brief

For a factory, warehouse or crane-equipped building.

  • Project context: country, location, building use and project stage.
  • Building layout: length, width, height, column layout and available plans.
  • Operating needs: equipment interfaces, crane requirements, openings and internal access.
  • Design basis: applicable specifications and site design information supplied by your project team.
  • Supply boundary: structural steel, connection items and any other requested package elements.
Review building applications ↗
02 / DRAWING-BASED PROCUREMENT

Steel Fabrication RFQ

For components manufactured to your project drawings.

  • Drawing control: drawing register, latest revision and approval status.
  • Quantity basis: member schedules, bill of quantities or the available steelwork list.
  • Technical scope: material grades, connections, welding and surface treatment requirements.
  • Responsibilities: who provides design information, detailing and drawing approval.
  • Procurement priorities: inspection requirements, delivery batches and target dates.
Review fabrication supply scope ↗
03 / SUPPLIER ASSESSMENT

Factory & Quality Review

For qualification checks, visits and inspection planning.

  • Certificate review: named company, production site, scope and validity information.
  • Project acceptance: required inspection methods, reporting and customer review points.
  • Quality documents: agreed material, welding, dimensional and treatment records.
  • Visit planning: assessment purpose, attendees, dates and information to review.
  • Third-party involvement: nominated organisation, inspection stages and notice requirements.
Review quality & certification ↗
04 / DELIVERY PREPARATION

Packing & Receiving Brief

For shipment batches and destination coordination.

  • Destination: receiving location and proposed transport handover point.
  • Identification: member marks, package references and batch lists.
  • Handling: known transport limits, unloading equipment and storage conditions.
  • Sequence: priority areas, associated items and requested receiving dates.
  • Documents & parties: packing information, release records and logistics responsibilities.
Review export & delivery ↗

02 / A REUSABLE ENQUIRY BRIEF

One Brief to Share
with Your Project Team.

Download the plain-text template, fill in the details available and send it with your drawings or document link.

Download RFQ Template (.txt) ↓

Editable plain text · no registration required

RFQ BRIEF / WHAT TO INCLUDE
  1. Company, contact and project country
  2. Building use or steelwork supply scope
  3. Drawings, revision and available quantities
  4. Materials, finishes and inspection requirements
  5. Delivery location, batches and target dates
  6. Responsibility boundaries and open questions
Send the completed brief ↗

03 / COMMON PROCUREMENT QUESTIONS

Before You Send
the Enquiry.

Clarify the starting point so your request reaches the right people with the right information.

Can you manufacture to our drawings?

Yes. Customer drawing-based fabrication is accepted. Send the available drawings, member schedule and specifications so the actual package can be reviewed.

What if our information is still at tender stage?

Share the information available and mark it as preliminary. Identify the design decisions and quantities that still need confirmation, so the quotation basis can be stated clearly.

Which drawing software do you use?

Our drawing coordination uses Tekla Structures and CAD. Tell us the file format and software version when sharing models or drawing files.

Are there standard size or treatment limits?

Component dimensions, material requirements and surface treatments are reviewed for the actual order. Include the member sizes and finish specification in your RFQ rather than relying on a generic maximum-size list.

Can we visit the factory or appoint an inspector?

Yes. Customer visits and third-party inspections are welcome by arrangement. Share the proposed scope and dates through the factory visit enquiry ↗.

How should we submit large drawing files?

Email the files to [email protected] or provide a document link in the enquiry form. Include the project name, drawing revision and any access instructions needed to open the link.

WhatsApp