Skip to content
STEEL MANUFACTURING IN CHINAGlobal project enquiries
Lunan Logistics Park steel structure project

China · Warehouses & Logistics

Lunan Logistics Park Steel Building, China

A 19,381.76-square-metre portal-frame logistics building in Linyi, designed for warehouse and distribution operations.

Location
Linyi, China
Building use
Logistics & warehousing
Structure
Single-storey portal frame
Building area
19,381.76 m²
Eave height
9.75 m

Project Overview

The Shandong Expressway Lunan High-Tech Logistics Park building is located in Luozhuang District, Linyi. It covers 19,381.76 square metres and uses a single-storey portal steel frame on independent foundations.

Building Characteristics

The building has an eave height of 9.75 metres. Its portal-frame layout provides space for warehouse and distribution operations.

PROJECT ENQUIRIES

Discuss Your
Steelwork Requirements

Tell us your project location, steelwork scope and delivery requirements. Complete the form here and add a drawing link if available.

Send Your Project Enquiry

Share the information you have. Add a drawing link if available.

Tiancheng Project Enquiry

Share a file link if you have drawings. We use your details to respond to this enquiry.

WhatsApp