Skip to content
STEEL MANUFACTURING IN CHINAGlobal project enquiries
Tiancheng intelligent manufacturing industrial park exterior

PROJECT ENQUIRIES · DRAWING REVIEW · FACTORY VISITS

Bring Your Steelwork Project
to the Manufacturing Team.

Tell us what you need to source, where the project is located and which information is available. Start with a building brief, a drawing package or a supplier assessment request.

Send your project enquiry ↓

01 / SHARE YOUR PROJECT

Give Us a Clear
Starting Point.

Choose the enquiry type and describe the steelwork or building package. Mark information that is still preliminary so the review starts from the right basis.

  1. 01

    Project & Location

    Building use or fabrication scope, project country and your role in the procurement.

  2. 02

    Drawings & Requirements

    Available drawings, quantities, material requirements and the documents you need.

  3. 03

    Priorities & Next Step

    Target dates, supply stages, inspection requests or a proposed factory visit.

Have Drawings to Share?

Paste a document link into the form, or email files to [email protected]. Include the project name and drawing revision. For model files, tell us the format and software version.

Use the RFQ brief template ↗

Send a Project Enquiry

Fields marked * are required. Use the message field for factory visit requests and document requirements.

Tiancheng Project Enquiry

Share a file link if you have drawings. We use your details to respond to this enquiry.

02 / MEET YOUR SUPPLIER

Factory Visits &
Supplier Assessments.

Customer teams and appointed third-party inspectors are welcome by arrangement. Our manufacturing base is in Linyi, Shandong, China; confirm the relevant site and meeting arrangements with us before travelling.

Send a factory visit request ↑

Include in Your Request

  • Your company and project scope.
  • Proposed dates, attendees and language needs.
  • Factory assessment or order inspection purpose.
  • Documents, production stages or checks you want to review.
Front exterior of the Tiancheng office building

HEAD OFFICE / LINYI, CHINA

Meet the Team
Behind Your Steelwork.

No. 95 Huaxia Road
Linyi Economic Development Zone
Linyi, Shandong, China

Arrange an office meeting or factory assessment with our team. We will confirm the relevant manufacturing site and visit arrangements for your project.

Arrange Your Visit ↗
WhatsApp