Skip to content
Discuss Your
WhatsApp
STEEL MANUFACTURING IN CHINAGlobal project enquiries
- Location
- Linyi Comprehensive Bonded Zone, China
- Application
- Cross-border e-commerce bonded warehousing
- Structure
- Steel frame
- Height
- 15 m to the roof parapet
Project Overview
The Lanhua bonded warehouse is located in Linyi's Comprehensive Bonded Zone. It forms part of a cross-border e-commerce industrial park with bonded warehousing facilities.
Steel Frame & Building Envelope
The building uses a steel frame and has a height of 15 metres from external ground level to the roof parapet. The project gallery shows the frame construction and external wall work.
Project Gallery
Select an image to view it at full size.
PROJECT ENQUIRIES
Discuss Your
Steelwork Requirements
Sourcing a steel-framed logistics building? Send the structural drawings, required height definition and interfaces with the envelope package. Complete the form here and add a drawing link if available.
Send Your Project Enquiry
Share the information you have. Add a drawing link if available.






