Skip to content
STEEL MANUFACTURING IN CHINAGlobal project enquiries
Aerial view of Tiancheng office building and manufacturing facilities

Steel Structure Insights

Multiple robotic welding workstations and structural steel members in the Tiancheng workshop

Inside Tiancheng’s Robotic Welding Workflow

How drawing information, workshop preparation, robotic welding operations and inspection requirements connect in a steelwork package.

Robotic welding workstations are part of Tiancheng’s structural steel manufacturing operations. They sit within a wider sequence of material preparation, component assembly, welding, inspection and finishing. The drawings and the agreed order requirements connect those stages.

For a buyer, equipment photographs are only one part of a supplier review. It is also useful to understand how a drawing package reaches the workshop, which information controls production and how inspection requirements stay linked to the components.

Prepare the fabrication information

Before production release, the team coordinates the drawing revision, member geometry, materials, connections and finish requirements. Tekla Structures and CAD support detailing and fabrication coordination. Open questions about the supply boundary or approval responsibilities need to be identified alongside the drawings.

The objective is to give the workshop clear instructions for the actual package. A member schedule, connection details and an agreed revision status provide a clearer starting point than a general building description alone.

Tiancheng technician reviewing a drawing beside fabricated structural steel components
Drawing review beside fabricated steel components at the Tiancheng workshop.

Connect automated operations with workshop preparation

Plates and members move through preparation and assembly before the relevant welding operations. Stiffeners, connection plates and adjoining members are coordinated against the fabrication details. Robotic workstations operate within that production sequence; the fabrication approach is reviewed for the components in the order.

Customers can review the real component photographs to see H-section, box and lattice columns, beams and trusses. These shapes involve different member arrangements and connection details, which should be reflected in the information supplied to the factory.

Keep inspection requirements linked to production

The inspection plan needs to identify the checks, acceptance requirements and reporting expected for the steelwork. Relevant dimensions, assembly and welding checks are considered at the agreed stages before affected components move into subsequent work.

Material records, welding documentation, specified non-destructive testing and treatment records can be included according to the project requirements. Tell the team which customer review points or third-party inspections need to be coordinated with the manufacturing sequence.

Use a factory review to discuss your package

Tiancheng accepts customer factory visits and appointed third-party inspections by arrangement. Share the intended purpose, your steelwork scope, proposed dates and the production stages or documents you want to review. This helps the visit focus on the questions relevant to your procurement.

See the manufacturing process and quality and documentation information, then send your available drawings through the enquiry form below. The team can discuss how the order requirements relate to production, inspection and dispatch.

About the Author

Discuss Your Steelwork Requirements

Share your project location, drawings and supply scope. Our team will review the information available.

Tiancheng Project Enquiry

Share a file link if you have drawings. We use your details to respond to this enquiry.

WhatsApp