Steel Structures for a Photovoltaic Manufacturing Base
A photovoltaic and energy-storage manufacturing development combining factory space with research and office accommodation.
Location
Hedong District, Linyi, China
Industry
Photovoltaic modules and energy storage
Development gross floor area
37,634.89 square metres
Factory levels
One storey with local second-level areas
R&D office
Three above-ground levels
Structure
Steel construction with local frame sections
Project Overview
The Defeng Xingyuan production base is located in Hedong District, Linyi. The photovoltaic module and energy-storage manufacturing development has a gross floor area of 37,634.89 square metres.
Production & Research Accommodation
Factory buildings are mainly single-storey, with local second-level areas. The R&D office has three above-ground levels. The structural system combines steel construction with local frame sections.
Project Gallery
Select an image to view it at full size.
Photovoltaic Manufacturing Base · project photographR&D office · project visualisation.Photovoltaic manufacturing buildings · aerial viewPhotovoltaic manufacturing building · architectural visualisationManufacturing campus · access road and factory buildingsPhotovoltaic manufacturing buildings · exterior aerial viewPhotovoltaic manufacturing workshop · roof and building exterior
Planning manufacturing and R&D accommodation together? Separate the building schedules, floor uses and requested steelwork packages in your brief. Complete the form here and add a drawing link if available.