Skip to content
STEEL MANUFACTURING IN CHINAGlobal project enquiries
Lanhua Bonded Warehouse steel structure project

China · Warehouses & Logistics

Bonded Warehouse Steel Frame in Linyi

A steel-framed warehouse building within a cross-border e-commerce bonded logistics park in Linyi.

Location
Linyi Comprehensive Bonded Zone, China
Application
Cross-border e-commerce bonded warehousing
Structure
Steel frame
Height
15 m to the roof parapet

Project Overview

The Lanhua bonded warehouse is located in Linyi's Comprehensive Bonded Zone. It forms part of a cross-border e-commerce industrial park with bonded warehousing facilities.

Steel Frame & Building Envelope

The building uses a steel frame and has a height of 15 metres from external ground level to the roof parapet. The project gallery shows the frame construction and external wall work.

PROJECT ENQUIRIES

Discuss Your
Steelwork Requirements

Sourcing a steel-framed logistics building? Send the structural drawings, required height definition and interfaces with the envelope package. Complete the form here and add a drawing link if available.

Send Your Project Enquiry

Share the information you have. Add a drawing link if available.

Tiancheng Project Enquiry

Share a file link if you have drawings. We use your details to respond to this enquiry.

WhatsApp