Skip to content
STEEL MANUFACTURING IN CHINAGlobal project enquiries
Recycled Aluminium Space Frame steel structure project

China · Long-span Structures

Industrial Space Frame for an Aluminium Materials Project

A 22,625.15-square-metre space-frame building for recycled aluminium alloy production in Binzhou.

Location
Binzhou, Shandong, China
Industry
Recycled aluminium alloy materials
Project owner
Shandong Chuangyuan Renewable Resources
Building area
22,625.15 square metres
Structure
Space frame with independent foundations
Levels
One storey with a local second level

Project Overview

This recycled aluminium alloy materials project is located in Binzhou, Shandong. The project owner is Shandong Chuangyuan Renewable Resources, and the building has a gross floor area of 22,625.15 square metres.

Space Frame & Structural Supports

The building uses a space frame on independent foundations, with one storey and a local second level. Its roof structure, supporting work and external enclosure are shown at different construction stages.

PROJECT ENQUIRIES

Discuss Your
Steelwork Requirements

Procuring steelwork for a process facility? Share the roof arrangement, support information and interfaces with the production equipment. Complete the form here and add a drawing link if available.

Send Your Project Enquiry

Share the information you have. Add a drawing link if available.

Tiancheng Project Enquiry

Share a file link if you have drawings. We use your details to respond to this enquiry.

WhatsApp