Skip to content
Discuss Your
WhatsApp
STEEL MANUFACTURING IN CHINAGlobal project enquiries
- Location
- Zouping, Binzhou, China
- Structure
- Double-layer cylindrical shell steel space frame
- Span
- 70 m
- Building length
- 180 m
- Building height
- 25.9 m
- Column spacing
- 9.47 m
Project Overview
The Binzhou Innovation Metal project is located in Zouping, Shandong. Its double-layer cylindrical shell steel space frame spans 70 metres.
Long-Span Industrial Enclosure
The building is 180 metres long and 25.9 metres high, with column spacing of 9.47 metres and independent foundations. The project received a provincial steel structure gold award.
Project Gallery
Select an image to view it at full size.
PROJECT ENQUIRIES
Discuss Your
Steelwork Requirements
Comparing long-span enclosure options? Share the roof geometry, support layout and required steelwork scope for review. Complete the form here and add a drawing link if available.
Send Your Project Enquiry
Share the information you have. Add a drawing link if available.




