Skip to content
STEEL MANUFACTURING IN CHINAGlobal project enquiries
Medical Products Manufacturing Buildings steel structure project

China · Industrial Factories

Steel Buildings for Medical Products Manufacturing

A medical-products manufacturing development combining multi-storey steel workshops with a portal-frame production building.

Location
Linyi, Shandong, China
Industry
Nonwoven materials and medical-related products
Planned production workshops
Six
Workshops 1-5
Three-storey steel frames
Workshop 6
Portal steel frame

Project Overview

The Nuolikang medical technology development is located in Linyi. Six production workshops are planned for nonwoven materials and medical-related products.

Two Building Types in One Development

Workshops 1-5 use three-storey steel frames. Workshop 6 uses a portal steel frame, accommodating a different production-space requirement within the same manufacturing development.

PROJECT ENQUIRIES

Discuss Your
Steelwork Requirements

Planning several production buildings? Identify the levels, use and structural requirements of each building in your brief. Complete the form here and add a drawing link if available.

Send Your Project Enquiry

Share the information you have. Add a drawing link if available.

Tiancheng Project Enquiry

Share a file link if you have drawings. We use your details to respond to this enquiry.

WhatsApp