Skip to content
STEEL MANUFACTURING IN CHINAGlobal project enquiries
Photovoltaic Manufacturing Base steel structure project

China · Industrial Factories

Steel Structures for a Photovoltaic Manufacturing Base

A photovoltaic and energy-storage manufacturing development combining factory space with research and office accommodation.

Location
Hedong District, Linyi, China
Industry
Photovoltaic modules and energy storage
Development gross floor area
37,634.89 square metres
Factory levels
One storey with local second-level areas
R&D office
Three above-ground levels
Structure
Steel construction with local frame sections

Project Overview

The Defeng Xingyuan production base is located in Hedong District, Linyi. The photovoltaic module and energy-storage manufacturing development has a gross floor area of 37,634.89 square metres.

Production & Research Accommodation

Factory buildings are mainly single-storey, with local second-level areas. The R&D office has three above-ground levels. The structural system combines steel construction with local frame sections.

PROJECT ENQUIRIES

Discuss Your
Steelwork Requirements

Planning manufacturing and R&D accommodation together? Separate the building schedules, floor uses and requested steelwork packages in your brief. Complete the form here and add a drawing link if available.

Send Your Project Enquiry

Share the information you have. Add a drawing link if available.

Tiancheng Project Enquiry

Share a file link if you have drawings. We use your details to respond to this enquiry.

WhatsApp