Skip to content
STEEL MANUFACTURING IN CHINAGlobal project enquiries
Binzhou Metals Space Frame steel structure project

China · Long-span Structures

Industrial Space Frame for a Metals Facility in Binzhou

A 70-metre-span double-layer cylindrical shell steel space frame for a metals facility in Binzhou.

Location
Zouping, Binzhou, China
Structure
Double-layer cylindrical shell steel space frame
Span
70 m
Building length
180 m
Building height
25.9 m
Column spacing
9.47 m

Project Overview

The Binzhou Innovation Metal project is located in Zouping, Shandong. Its double-layer cylindrical shell steel space frame spans 70 metres.

Long-Span Industrial Enclosure

The building is 180 metres long and 25.9 metres high, with column spacing of 9.47 metres and independent foundations. The project received a provincial steel structure gold award.

PROJECT ENQUIRIES

Discuss Your
Steelwork Requirements

Comparing long-span enclosure options? Share the roof geometry, support layout and required steelwork scope for review. Complete the form here and add a drawing link if available.

Send Your Project Enquiry

Share the information you have. Add a drawing link if available.

Tiancheng Project Enquiry

Share a file link if you have drawings. We use your details to respond to this enquiry.

WhatsApp