Skip to content
STEEL MANUFACTURING IN CHINAGlobal project enquiries
Yimeng Guanggu · Factory 11 steel structure project

China · Industrial Factories

Factory Building 11 at Yimeng Guanggu, China

A 13,284.20-square-metre production building combining a portal steel frame with a local three-storey area.

Location
Linyi Economic and Technological Development Zone
Building
Phase I, Factory Building 11
Building area
13,284.20 square metres
Levels
Mainly one storey; local three-storey area
Structure
Portal steel frame with a local frame section
Column arrangement
Steel factory columns and RC frame columns

Project Overview

Factory Building 11 in Phase I of Yimeng Guanggu is located in Linyi. The building has a gross floor area of 13,284.20 square metres and is mainly single-storey, with a local three-storey area.

Different Structures Within One Building

The production hall uses steel columns and a portal steel frame. The local frame area incorporates reinforced-concrete columns, combining production space and multi-level accommodation within one building.

PROJECT ENQUIRIES

Discuss Your
Steelwork Requirements

Combining a production hall with multi-level accommodation? Send the building layout and the boundaries between steel and concrete work. Complete the form here and add a drawing link if available.

Send Your Project Enquiry

Share the information you have. Add a drawing link if available.

Tiancheng Project Enquiry

Share a file link if you have drawings. We use your details to respond to this enquiry.

WhatsApp