Skip to content
STEEL MANUFACTURING IN CHINAGlobal project enquiries
Linyi Shangcheng School steel structure project

China · Public & Multi-storey Buildings

Composite Frame Teaching Building in Linyi

A 16,690.38-square-metre school reconstruction project using concrete-filled steel framing.

Location
Lanshan District, Linyi, China
Building use
Primary school reconstruction
Building area
16,690.38 square metres
Levels
Five above ground and one basement
Structure
Concrete-filled steel tube frame
Column detail
Box columns with C30 self-compacting concrete

Project Overview

The Linyi Shangcheng Experimental School primary section reconstruction is located in Lanshan District, Linyi. It has five above-ground storeys, one basement and a gross floor area of 16,690.38 square metres.

Steel & Concrete in the Frame

The building uses a concrete-filled steel tube frame. Box columns are filled with C30 self-compacting concrete, combining steel members and concrete within the structural system.

PROJECT ENQUIRIES

Discuss Your
Steelwork Requirements

Sourcing composite-frame members? Share the steel sections, concrete interfaces and allocation of fabrication, filling and approval responsibilities. Complete the form here and add a drawing link if available.

Send Your Project Enquiry

Share the information you have. Add a drawing link if available.

Tiancheng Project Enquiry

Share a file link if you have drawings. We use your details to respond to this enquiry.

WhatsApp