Skip to content
Discuss Your
WhatsApp
STEEL MANUFACTURING IN CHINAGlobal project enquiries
- Location
- Lanshan District, Linyi, China
- Building use
- Primary school reconstruction
- Building area
- 16,690.38 square metres
- Levels
- Five above ground and one basement
- Structure
- Concrete-filled steel tube frame
- Column detail
- Box columns with C30 self-compacting concrete
Project Overview
The Linyi Shangcheng Experimental School primary section reconstruction is located in Lanshan District, Linyi. It has five above-ground storeys, one basement and a gross floor area of 16,690.38 square metres.
Steel & Concrete in the Frame
The building uses a concrete-filled steel tube frame. Box columns are filled with C30 self-compacting concrete, combining steel members and concrete within the structural system.
Project Gallery
Select an image to view it at full size.
PROJECT ENQUIRIES
Discuss Your
Steelwork Requirements
Sourcing composite-frame members? Share the steel sections, concrete interfaces and allocation of fabrication, filling and approval responsibilities. Complete the form here and add a drawing link if available.
Send Your Project Enquiry
Share the information you have. Add a drawing link if available.









