Production Buildings for a Recycling Facility, Linyi
A resource recycling development with four planned production workshops and portal steel framing.
Location
Yihe New Area, Linyi, China
Application
Resource recycling facility
Structure
Portal steel frame
Planned production workshops
Four
Building height
10 m to roof parapet
Project Overview
The Yimeng Resource Recycling Centre is located in Yihe New Area, Linyi. Its development plan includes four production workshops using portal steel framing.
Industrial Buildings for Processing Operations
The building height is 10 metres to the roof parapet. Production workshops and supporting accommodation serve the resource recycling operation.
Project Gallery
Select an image to view it at full size.
Yimeng Recycling Facility · project photographYimeng Recycling Facility · project photographRecycling facility · steel frame and facade installationRecycling facility · production building under constructionRecycling facility · corner view of production buildingRecycling facility · production building visualisation
Preparing a recycling or process-building package? Include the equipment arrangement, required clearances and the specific buildings in your enquiry. Complete the form here and add a drawing link if available.