Skip to content
Discuss Your
WhatsApp
STEEL MANUFACTURING IN CHINAGlobal project enquiries
- Location
- Linyi Economic and Technological Development Zone
- Building
- Phase I, Factory Building 11
- Building area
- 13,284.20 square metres
- Levels
- Mainly one storey; local three-storey area
- Structure
- Portal steel frame with a local frame section
- Column arrangement
- Steel factory columns and RC frame columns
Project Overview
Factory Building 11 in Phase I of Yimeng Guanggu is located in Linyi. The building has a gross floor area of 13,284.20 square metres and is mainly single-storey, with a local three-storey area.
Different Structures Within One Building
The production hall uses steel columns and a portal steel frame. The local frame area incorporates reinforced-concrete columns, combining production space and multi-level accommodation within one building.
Project Gallery
Select an image to view it at full size.
PROJECT ENQUIRIES
Discuss Your
Steelwork Requirements
Combining a production hall with multi-level accommodation? Send the building layout and the boundaries between steel and concrete work. Complete the form here and add a drawing link if available.
Send Your Project Enquiry
Share the information you have. Add a drawing link if available.







