Steelwork Delivery.
Planned Around Your Site.

Agree component identification, export packing and shipment priorities before dispatch, so your receiving team knows what is arriving and which package it belongs to.

Explore packing & delivery coordination ↓

01 / STRUCTURAL STEEL EXPORT PACKING

Connect Each Member
to Its Delivery Package.

The packing plan should reflect the steelwork dimensions, surface finish, transport arrangement and receiving conditions.

ILLUSTRATIVE IDENTIFICATIONMember → Package → Shipment
MEMBER MARK / EXAMPLEB02 · C-014
B02

Agreed shipment batch

C-014

Drawing / member reference

Concept only. Actual marks and packing references follow the agreed project system.
01

Match the Marking System

Agree member references, package identifiers and their connection to the drawing or member schedule.

02

Define Protection & Supports

Review bundling, separation, supports and finish protection for the actual components and transport route.

03

Confirm Handling Constraints

Tell us about container or vehicle limits, unloading equipment and site storage requirements before the packing arrangement is finalised.

02 / SHIPMENT SEQUENCING

Agree What Travels Together.
Know What Comes First.

For phased supply, identify your receiving priorities early and confirm how the steelwork is divided between shipment batches.

  1. 01 / DEFINE

    Set Site Priorities

    Identify building zones, member groups and the dates your receiving team is working towards.

  2. 02 / GROUP

    Build the Batch List

    Agree package contents and identify which associated items must travel with each member group.

  3. 03 / REVIEW

    Confirm Before Release

    Review batch contents, inspection status and dispatch information before the shipment is released.

Production readiness, transport arrangements and your required sequence are reviewed together. Shipment dates are confirmed for the actual order.

03 / DISPATCH & RECEIVING INFORMATION

Make the Handover
Easier to Check.

Agree the document list, format and issue timing before dispatch. Destination-specific requirements should be included in your enquiry.

Information to agree for your steelwork shipment
InformationWhat to confirmWhy it matters at handover
Packing ListPackage references, quantities and agreed weight or dimensional information.Reconcile the delivered packages with the shipment records.
Member / Batch ReferencesMember identifiers, associated drawings and batch allocation.Connect received steelwork to the project package.
Quality Release RecordsRequired inspection records, acceptance points and release status.Keep technical acceptance information linked to dispatch.
Shipping & Commercial DocumentsRequired documents, responsible parties and information needed by the appointed logistics team.Coordinate the transport handover and destination document review.

Quality record details are covered on the quality and inspection page ↗.

04 / AGREE THE DELIVERY INTERFACES

Clear Responsibilities.
Fewer Handover Gaps.

Factory & Logistics Handover

Confirm the delivery point, transport booking responsibility and dispatch notification process in the order.

Destination & Receiving

Identify who handles destination procedures, unloading, storage and the check of received packages.

Site Services

Discuss any requested site support separately, including its location, scope and responsibilities.

Structural steel components being handled for the Indonesia project
OVERSEAS STEEL SUPPLY

Indonesia Truck Warehouse

Our steel components being handled at the Indonesia truck warehouse project.

View this project reference ↗

05 / PREPARE YOUR DELIVERY BRIEF

Where Is Your Steelwork Going?

Send the information available so the delivery arrangement can be considered with the fabrication offer.

Discuss Your Delivery Requirements ↗
  • 01
    Destination

    Project country, delivery location and proposed port or receiving point.

  • 02
    Package & Handling

    Drawings, quantities, known size constraints and unloading arrangements.

  • 03
    Sequence & Timing

    Priority zones, requested batches and target receiving dates.

  • 04
    Documents & Responsibilities

    Document requirements, logistics contacts and the proposed supply boundary.