Skip to content
STEEL MANUFACTURING IN CHINAGlobal project enquiries
Large steel members and assembly equipment at the Tiancheng workshop

INSPECTION · DOCUMENTATION · SUPPLIER REVIEW

Structural Steel Quality Control
You Can Review.

Define the acceptance requirements, inspection stages and records for your steelwork before production begins.

View certificates & EN 1090 documentation ↓

01 / MANAGEMENT SYSTEMS

Review the Certificates.
Confirm the Project Requirements.

Open the original certificate images for your supplier assessment. Request the documents relevant to your order.

These are management system certificates. Product conformity, applicable project standards and acceptance requirements are reviewed separately for the steelwork package.

CE / EN 1090 DOCUMENTATION

Structural Steelwork.
A Defined Certification Scope.

EN 1090-1 · EXECUTION CLASS EXC2

Factory production control certificate 2787-CPR-01712 covers structural steel components manufactured by Shandong Tiancheng Construction Engineering Technology Co., Ltd. at the production site named on the certificate.

Tiancheng EN 1090 factory production control certificate 2787-CPR-01712, execution class EXC2View certificate image ↗

Factory Production Control Certificate

Certificate Number
2787-CPR-01712
Certification Body
OTC Bulgaria Ltd. · Notified Body 2787
Issue Date
03 August 2026
Expiry Date
02 August 2029

Our welding scope includes the materials and processes below. Contact our team for the certificate and welding annex.

Factory Production Control
EN 1090-1:2009+A1:2011
Assessment system 2+
Execution Class
EXC2
Structural components for steel structures
Welding Specification
EN 1090-2:2018+A1:2024
Welding annex scope
Materials in the Annex
S235 and S355
According to EN 10025-2
Welding Processes
121 — Submerged arc welding
135 — MAG welding
Manufacturing Processes
Cutting, drilling, welding, NDT and corrosion protection

Scope & supporting documents: This certificate applies to the named production site and stated scope. Its terms require an accompanying Document of validity. Request the current validity document and welding annex when assessing the certificate for your project.

PROFESSIONAL QUALIFICATIONS & METHODS

Experience Supported
by Original Documents.

Review selected Chinese professional qualification and industry recognition documents alongside the quality systems relevant to your order.

China construction enterprise qualification for Shandong Tiancheng Steel Structure Co., Ltd., Grade I steel structure specialist contractingView original document ↗
CHINA / SPECIALIST CONTRACTING

Grade I Steel Structure Qualification

Shandong Tiancheng Steel Structure Co., Ltd. holds Grade I steel structure specialist contracting qualification in China.

Document number
D137120276
Valid until
22 December 2028
2025 Shandong steel structure industry construction method recognition for Shandong Tiancheng Steel Structure Co., Ltd.View original document ↗
2025 / INDUSTRY METHOD RECOGNITION

Construction Method Development

A company-developed method for installing inter-storey viscous dampers received recognition from the Shandong steel structure industry association.

Method reference
SDSCSGF-2025-YX005
Organisation named
Shandong Tiancheng Steel Structure Co., Ltd.

Our Chinese professional qualification and industry recognition support supplier assessment. Project standards, certification scope and acceptance requirements are agreed for each order.

COMPANY REGISTRATION & CHINA QUALIFICATIONS

Documents for Your
Supplier Assessment.

Review our company registration and Chinese construction qualifications alongside the quality and product certification relevant to your order.

Grade II building construction general contracting qualification for Shandong Tiancheng Steel Structure Co., Ltd.
CHINA / GENERAL CONTRACTING

Grade II Building Construction

Building construction general contracting qualification held by Shandong Tiancheng Steel Structure Co., Ltd.

Document D237065454
Valid until 2 January 2029
View qualification PDF ↗
Safety production licence for Shandong Tiancheng Steel Structure Co., Ltd., valid from 6 May 2025 to 4 May 2028
CHINA / SAFETY PRODUCTION

Safety Production Licence

Safety production licence issued to Shandong Tiancheng Steel Structure Co., Ltd.

6 May 2025 – 4 May 2028
View original licence ↗
Business licence for Shandong Tiancheng Steel Structure Co., Ltd.
COMPANY REGISTRATION

Business Licence

Company registration document for Shandong Tiancheng Steel Structure Co., Ltd.

Registered address: No. 95 Huaxia Road, Linyi, Shandong, China
View registration document ↗

02 / INSPECTION THROUGH PRODUCTION

Set the Checks
at the Right Stages.

Tiancheng’s quality management covers incoming materials, manufacturing, finished components and release inspection.

Tiancheng technician checking steel plate dimensions in the factory
Steel plate dimensional inspection · Tiancheng workshop
  1. 01

    Incoming Materials

    Check material identification and the documentation required to assess conformity with the order specification.

  2. 02

    Fabrication Checks

    Define dimensional, assembly and welding checks, including specified testing and customer review points.

  3. 03

    Finished Components

    Review the finished steelwork and surface treatment against the agreed acceptance requirements.

  4. 04

    Release for Dispatch

    Coordinate component identification, required inspection records and packing information before release.

Tiancheng workshop technician measuring a structural steel member
Steel member measurement · Tiancheng workshop photograph

PEOPLE BEHIND THE CHECKS

Practical Skills.
Attention to the Details.

Manufacturing quality depends on people who understand the work. Our company supports practical skills development across workshop and project teams.

2025 / COATING SKILLS

Provincial Skills Competition Recognition

Three Tiancheng employees received two third prizes and one excellence award in the provincial construction-industry coating skills competition.

Explore the workshop process ↗

03 / HANDOVER RECORDS

Agree the Document List
with Your Order.

Inspection and supporting records can be provided according to the agreed scope. Specify methods, acceptance criteria and reporting requirements in the enquiry.

01 / MATERIALS

Material Documentation

Required material certificates and identification records for the steelwork.

02 / WELDING

Welding Records

Agreed welding-related documentation and qualification records.

03 / DIMENSIONS

Dimensional Inspection

Checks against approved fabrication information and specified tolerances.

04 / TESTING

Non-destructive Testing

Testing methods, extent and reports defined for the project requirements.

05 / FINISH

Coating & Treatment

Surface preparation and treatment inspection records within the order scope.

06 / DISPATCH

Identification & Packing

Member identification and packing information to support receiving and handover.

Bring your inspection specification or vendor questionnaire.

Tell us the required document format, review stages and handover timing so these can be addressed in the offer.

04 / OPEN TO YOUR SUPPLIER REVIEW

Factory Visits &
Third-party Inspection Welcome.

Your project team or appointed inspection organisation is welcome to assess our factories and inspect the work. Agree the visit scope and timing with us before the relevant production stages.

Discuss Your Inspection Requirements ↗

Include These Details

Purpose of the review
Factory assessment, order inspection or document review.
Project & inspection scope
Steelwork package, specified checks and relevant drawings.
Attendees & timing
Your team or nominated organisation, proposed dates and notice requirements.
Reporting requirements
Inspection specification, acceptance criteria and required records.
WhatsApp