Skip to content
STEEL MANUFACTURING IN CHINAGlobal project enquiries
Fabricated H-section steel members in the Tiancheng workshop

DRAWING-BASED STEELWORK SUPPLY

Structural Steel Fabrication
for Your Project Package.

Bring your drawings to the manufacturer. Define the steelwork, technical requirements and delivery priorities before your order moves into production.

Submit Drawings for Quotation ↗

01 / COMPONENTS FABRICATED TO YOUR DRAWINGS

Steel Columns,
Beams & Trusses.

Explore nine component types through real fabrication, delivery and site photographs. Open each card for the details to include in your drawing package.

Fabricated H-section columns ready for delivery
Steel columns

Welded H-section Steel Columns

Built-up H-sections for factory frames, with plate and connection geometry fabricated to your drawings.

Fabrication details
Section details
Section depth, flange and web plates, column length and stiffeners.
Interfaces
Base plates, end plates, brackets and beam connections.
Discuss this component ↗
Fabricated box columns in the Tiancheng workshop
Steel columns

Welded Box Columns

Square and rectangular built-up columns for industrial frames and other project-specific steelwork.

Fabrication details
Internal construction
Plate arrangement, diaphragms and access required by the fabrication details.
Connections
Column splices, brackets, base plates and adjoining beam details.
Discuss this component ↗
Lattice steel columns during workshop fabrication
Steel columns

Built-up Lattice Columns

Multi-part columns with connecting lacing or plates, including heavy industrial building applications.

Fabrication details
Member arrangement
Column branches, lacing, connection plates and overall geometry.
Project interfaces
Crane-support details, column bases and transport assembly divisions.
Discuss this component ↗
Circular tube columns during frame erection
Steel columns

Circular Steel Tube Columns

Round tube columns with welded brackets and connection details for structural frames.

Fabrication details
Tube geometry
Outside diameter, wall thickness, length and specified material.
Fabricated connections
Column caps, base plates, brackets, splices and beam interfaces.
Discuss this component ↗

Site erection photograph

Fabricated cruciform steel columns prepared for dispatch
Steel columns

Cruciform Steel Columns

Cross-shaped steel columns fabricated for multi-directional structural connections.

Fabrication details
Cross-section
Plate layout, section dimensions and the required column length.
Joint details
Intersecting beam levels, stiffeners, splice details and connection plates.
Discuss this component ↗
Fabricated roof beams prepared for an industrial building
Steel beams

Welded Steel Roof Beams

Roof framing members with the section profile, stiffeners and connections defined by your project.

Fabrication details
Member profile
Straight or tapered geometry, plate dimensions and roof-frame arrangement.
Assembly details
Haunches, end plates, purlin connections and transport splices.
Discuss this component ↗
Fabricated platform beams at the Tiancheng factory
Steel beams

Welded Steel Platform Beams

Fabricated H-section beams for platforms and frames, coordinated with the supporting columns.

Fabrication details
Platform layout
Member schedules, beam levels and the supporting frame connections.
Fabrication details
Stiffeners, web openings and secondary member interfaces in the drawings.
Discuss this component ↗
Fabricated crane runway beams ready for project delivery
Steel beams

Steel Crane Runway Beams

Fabricated runway beams for crane-equipped industrial buildings and production facilities.

Fabrication details
Crane information
Crane supplier requirements, support layout and approved member geometry.
Runway interfaces
Rail attachments, end connections, stiffeners and adjoining steelwork.
Discuss this component ↗
Steel truss assembly in the Tiancheng workshop
Steel trusses

Fabricated Steel Trusses

Chord-and-web assemblies for roof structures and other long-span steelwork packages.

Fabrication details
Truss geometry
Overall form, chord and web members, nodes and support details.
Assembly & delivery
Fabrication segments, trial assembly requirements and transport connections.
Discuss this component ↗

Member dimensions, material grades, welding, surface treatment and inspection requirements follow the agreed project specification.

Explore the workshop process ↗

02 / FROM ENQUIRY TO ORDER

Make the Order Clear
Before Manufacturing Starts.

Keep procurement, engineering and inspection requirements connected through each commercial decision.

  1. 01

    Send the RFQ

    Provide drawings, quantities, specifications, project location and required delivery stages.

    INPUT: YOUR PROJECT PACKAGE
  2. 02

    Review Scope & Offer

    Resolve scope questions, list the proposed inclusions and identify assumptions for confirmation.

    AGREE: THE QUOTATION BASIS
  3. 03

    Confirm & Release

    Agree technical responsibilities, drawing approvals and the requirements for production release.

    CONFIRM: APPROVED INFORMATION
  4. 04

    Inspect & Dispatch

    Coordinate inspection points, acceptance records, packing and the agreed shipment sequence.

    HAND OVER: STEELWORK & RECORDS

03 / DEFINE THE CONTRACT PACKAGE

Compare Offers
Against the Same Scope.

Identify the steelwork and supporting requirements your offer should cover. Agree responsibilities for the surrounding design and site interfaces.

Large steel members and assembly equipment at the Tiancheng workshop
Steel member assembly · Tiancheng workshop
PACKAGE REVIEWDrawings → Agreed Supply Scope
Steelwork & Connections
Member list, connection items and the limits of the fabrication package.
Materials & Finishes
Specifications, proposed treatments and project acceptance requirements.
Inspection & Documents
Review points, third-party involvement and the required handover records.
Engineering & Delivery
Drawing responsibilities, revision control, marking and shipment batches.
Scope illustration · project arrangements follow the approved drawings.
Fabricated structural steel loaded for factory dispatch for the Guinea alumina order
OVERSEAS FABRICATION & DISPATCHGuinea Alumina Fabrication OrderView the project reference ↗

04 / PREPARE YOUR QUOTATION REQUEST

Send a Package
We Can Price Clearly.

Send the information available and identify what is still at tender or design stage. A defined brief gives your team a clearer basis for comparing the offer.

  • 01
    Drawings & Quantities

    Latest revision, member schedules or bill of quantities.

  • 02
    Technical Requirements

    Materials, welding, dimensions and surface treatment specifications.

  • 03
    Inspection & Acceptance

    Required tests, customer review points and document list.

  • 04
    Delivery & Responsibilities

    Destination, target dates, supply boundary and required batches.

Send Your Fabrication Package ↗

Share a drawing link in the enquiry or email documents to [email protected].

WhatsApp